Dampak Beroperasi Gardu Induk 500 KV Durikosambi Pada Subsistem Gandul-Muarakarang-Kembangan Terhadap Biaya Pokok Produksi

Main Article Content

Ujang Wiharja wiharja
Jumali

Abstract

The DKI Jakarta and Banten Load Management Implementation Unit is one of the load control areas in the Java Bali system which participates in load regulation and has 10 subsystems. However, in the current conditions, the Gandul 1.3 - Muarakarang - Kembangan 2 subsystem has several system vulnerabilities. the most transmitted is on the Durikosambi-Kembangan cable channel which has an OCR setting of 1100 A (800 A limitation related to cable capacity and cable age factor at the request of the asset owner). This channel is the main route connecting the Muarakarang generator with IBT Gandul and IBT Kembangan2. For the Durikosambi IBT defense setting scheme, it uses the setting pattern that was previously applied to the Durikosambi-Kembangan SKTT with the same load target, only commissioning from the Durikosambi-Kembangan SKTT to Durikosambi IBT 1 and 2, with it being two new subsystems, there is no need to worry anymore about taking on Durikosambi-Kembangan SKTT so that electricity services can be optimal and the No Outage Zone can be maintained properly. With the operation of GISTET Durikosambi, the operational pattern for the Muarakarang Power Plant has changed, namely Muarakarang Block 1 and PLTU Muarakarang 4-5 can be positioned on standby (Reserve Shutdown). So the generating unit operating is only in Muarakarang Block 2 with an assumed operating pattern of an average of 680 MW in 24 hours

Downloads

Download data is not yet available.

Article Details

How to Cite
wiharja, U. W., & Jumali. (2024). Dampak Beroperasi Gardu Induk 500 KV Durikosambi Pada Subsistem Gandul-Muarakarang-Kembangan Terhadap Biaya Pokok Produksi . SUTET, 14(1), 88–97. Retrieved from https://jrnl.itpln.ac.id/sutet/article/view/2256
Section
Articles

References

APB DKI JKB. 2018. “Defense Scheme APB DKI Jakarta dan Banten”. Jakarta

UP2B JKB. 2018. Logsheet realisasi WPO Metro 2018. Jakarta

Permen ESDM No 3 2007. “Aturan Jaringan Tenaga Listrik Jawa-Madura-Bali”, Departemen Energi dan Sumber Daya Mineral. Jakarta

Fadilah Iqbal ., & Hidayat MR. “Pengaruh Pembebanan Terhadap Efisiensi Transformator Distribusi di PT. PLN UP3 Garut”, SUTET vol. 13, no.1, 2023, doi: 10.33322/sutet.v13i1.1799

Ghamsari-Yazdel, M., Esmaili, M., & Amjady, N. “Optimal Substation-based Joint Allocation of PMUs and Measuring Channels Considering Network Expansion Planning.” International Journal of Electrical Power and Energy Systems, 106. pp. 274–287, 2018, doi: 10.1016/j.ijepes.2018.10.010.

Hariyanto, A., Handayani, O., Kurniawan, D., & Elektro, T. “Studi Rele Differensial Pada Trafo Interbus Di Gardu Induk Tegangan Ekstra Tinggi Gandul.” Jurnal Sutet, vol. 6 no.1, 2016.

Humayun, M., Safdarian, A., Ali, M., Degefa, M. Z., & Lehtonen, M. “Optimal capacity planning of substation transformers by demand response combined with network automation.” Electric Power Systems Research, 134, pp. 176–185. 2016, doi: 10.1016/j.epsr.2016.01.011.

Kaewmamuang, K., Siritaratiwat, A., Surawanitkun, C., Khunkitti, P., & Chatthaworn, R. (2019). “A novel method for solving multi-stage distribution substation expansion planning.” Energy Procedia, 156, pp. 371–383, 2018, doi: 10.1016/j.egypro.2018.11.109

Li, N., Wang, X., Li, C., Zhang, Z., & Zhang, W. “The efficacy analysis method of input–output for substations based on LCC theory.” Energy Reports, 8, pp. 299–304, 2021, doi: 10.1016/j.egyr.2021.11.090

Šlihte, S., Križmane, M., & Dzelzitis, E. (2016). “Cost Analysis of In-House Heat Substations in Next Generation Heat Networks.” Energy Procedia, 96, pp. 511–516, 2016, doi: 10.1016/j.egypro.2016.09.093

Santoso, B., Qosim, M. N., & Ajiz, F. A. (2015). “Efisiensi Pembebanan PLTGU PT. Krakatau Daya Listrik Dengan Perhitungan Specific Fuel Consumtion Untuk Meminimalkan Biaya Produksi Listrik”. SUTET, 5(2), 68–74. https://doi.org/10.33322/sutet.v5i2.596

Prabowo, E., Hariyanto, A., & Purwoko, W. S. (2019). “Analisis Penurunan Biaya Pokok Penyediaan Tenaga Listrik Belawan Dengan Repowering PLTU Belawan 4X65 MW Menjadi PLTGU 500 - 600 MW”. SUTET, 8(1), 54–60. https://doi.org/10.33322/sutet.v8i1.716